Select Page

50 tons tool press to Germany

Project: Industrial assembly

Period: September 2025

Location: Germany

50 TONS OF STEEL – MOVES LIKE A FEATHERWEIGHT PACKAGE!

Extreme logistics? Exactly our thing.

When others were still drawing up plans, we delivered:
A 50-ton tool press, hydraulically lifted, positioned on heavy-duty rollers and maneuvered out of the production hall with pinpoint accuracy.

After that?

300-ton crane. Low loader. Precision landing.
Including all switch cabinets and accessories – everything neatly dismantled, packed for safe transportation and transferred to Germany.

Precision. Power. Experience.

We are not a “freight forwarder”. We are the solution when it really matters.

You have something difficult in mind? We make it easy.